Sale!
Halloween Sale Ends In:

Waste Basket Pull Out For B18 Cabinet

Original price was: $135.98.Current price is: $76.49.

“Maximize your kitchen waste storage with the Waste Basket Pull Out For B18, a convenient pull-out waste basket fitting two 35 QT trash cans.”

Description

“

Waste Basket Pull Out For B18 – Dual 35 QT Trash Cans

Maximize your kitchen waste storage with the Waste Basket Pull Out For B18, available now at The RTA Shop. This convenient pull-out waste basket fits two 35 QT trash cans, providing ample space for disposing of kitchen waste.

Key Features:

  1. Convenient Storage: Pull-out design allows for easy access to your trash cans.
  2. Ample Capacity: Fits two 35 QT trash cans, providing plenty of space for kitchen waste.
  3. Custom Fit: Designed specifically for B18 cabinets, ensuring a seamless installation.

Why Choose This Waste Basket Pull Out?

  • Double the Storage: Accommodates two 35 QT trash cans, perfect for large or busy kitchens.
  • Easy Access: Pull-out design makes it easy to dispose of waste and replace the trash bags.
  • Durable Construction: Built to withstand the demands of frequent use, ensuring a functional storage solution for years to come.

Purchase the Waste Basket Pull Out For B18 from The RTA Shop today and maximize your kitchen waste storage.

“

Additional information

Weight 19.8 lbs
Accessories Options